Utah Public Service Commission (Rocky Mountain Power / PacifiCorp) — Large-Load Flexible Tariff Investigation for Facilities Reaching 100 MW (per SB 132)

Utah Public Service Commission (Rocky Mountain Power / PacifiCorp) · Large-Load Flexible Tariff Investigation for Facilities Reaching 100 MW (per SB 132)

Following Utah SB 132 (2025), the Utah PSC opened an investigation into a flexible large-load tariff for Rocky Mountain Power covering facilities expected to reach at least 100 MW within five years, allowing such facilities to procure their own supply if serving them would require major ratepayer-funded upgrades.

Technical detail

Following Utah SB 132 (2025), the Utah PSC opened an investigation into a flexible large-load tariff for Rocky Mountain Power covering facilities expected to reach at least 100 MW within five years, allowing such facilities to procure their own supply if serving them would require major ratepayer-funded upgrades.

Who is protected: People subject to this body's AI/surveillance systems.

Who must comply: Utah Public Service Commission (Rocky Mountain Power / PacifiCorp)

Key facts

JurisdictionUtah Public Service Commission (Rocky Mountain Power / PacifiCorp)
LevelState
StatusIn effect
Protection strengthLimited protection
Effective date2025-03-01
CitationLarge-Load Flexible Tariff Investigation for Facilities Reaching 100 MW (per SB 132)
Topicsdata-center siting and energy · consumer protection · government use of AI
Last verified2026-07-01
Official sourceUtah is taking a different approach to new data center load | Latitude Media ↗